School, or at least two days of faculty meetings, begins tomorrow and so this past week has been spent making the space livable and to move it into place. While there are still loads to do, with the electric, plumbing, heating, etc. left to hook up, I have moved my mattress in. And for now, that is more than enough. Our friend Walter generously made the maple counter tops for me, along with tagging the underside. Incidentally, Walter is also the one who had tagged the vapor barrier with port-a-house. Framing for the counter on the south wall with the 12v fridge and sink. Framing for the counter on the north wall I finally got around to finishing the nose (as well as the roof) - in time for picking up the batteries from Massachusetts. This picture shows the roof of the nose mid trimming. For the toilet, I based the design off of the lovable loo. It's a bit wider to include a compartment for sawdust or other covering, and ...