Skip to main content

Posts

Showing posts from August, 2013

The beginning of interior work

The bathroom ceiling was the first section to go up.  I wanted to complete a whole section for that sense of immediate satisfaction before moving on to more complicated areas. That, and I just LOVE the cedar. The chimney support.... I have no idea how you're supposed to cut around pipes, but this made up method definitely worked for me. First I took a piece of paper, lined an edge up with the wall and drew the basic diameter of the pipe. Then I cut some slits so it could slide over the chimney support and used a pencil to scribe the resulting oval before cutting it out.  Since the bottom edge of the paper lined up with the wall, all I had to do was square it up, do some basic measurements, and trace. And voila! The light fixtures..... I got these nifty 12v light fixtures and in order to put them in had to cut some of the insulation for the part that protrudes as well as a rainbow like arc for the mc cable to be able to move in and out of the s...